Main content of the website

  • font sizeA
  • A
  • A

Stormwater Management

The 2022 Annual MS4 (GENERAL STORMWATER DISCHARGE PERMIT) Report


The Town of Monroe is registered under the Connecticut Department of Energy and Environmental Protection’s (CTDEEP) General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems. As part of its registration under the General Permit, the Town is required to file an annual report of activities undertaken to meet the Minimum Control Measures specified in the Permit and in the Town’s Stormwater Management Plan.

The 2022 Annual Report was submitted to CT DEEP upon the completion of a 45 day posting of a DRAFT version of the report for the purpose of obtaining public questions and/or comments posting ends May 15, 2023.

The DRAFT report can be viewed by clicking the following link.

Click here to view the DRAFT 2023 Annual MS4 (General Stormwater Discharge Permit) Report.

Click here to view the 2022 Annual MS4 (General Stormwater Discharge Permit) Report.